Torsion tube (Heavy Duty Lift Arms)

The heavy duty arm kit replaces the existing arms on the front hitch with 2 new arms that have holes drilled in on each arm to mount the torsion tube. This cross tube holds both arms together in the locked position when using the front hitch in an ground engaging application. This heavy duty lift arm kit ensures that the front hitch has no free play in the arms.

When an PTO driven implement is hooked up to the front 3pt hitch it must be verified there is enough clearnce between the cross tube and the shaft from the implement to the PTO. If not, the torsion must be dismounted by 4 bolts which takes approx 4 – 6 minutes.

We’re here to help
Call or e-mail us today.

T: 319-553-4800
E: sales@zuidbergna.com

Contact form